Governed Record Answer
When is PH1 (3 Bed 2 Bath 1031 SF) at O2 METROTOWN expected to complete?
Verified record BURNABY, BCMOOV-2994Completion
Answer
PH1 (3 Bed 2 Bath 1031 SF) at O2 METROTOWN has an expected completion of May 2026, last confirmed on Sep 20, 2026.
This answer comes directly from the governed housing record for O2 METROTOWN in BURNABY, BC. It reflects the record at its last confirmation and can change when the record is updated.
About this record
Related questions
What is the deposit structure for PH1 (3 Bed 2 Bath 1031 SF) at O2 METROTOWN?What floor plans are available at PH1 (3 Bed 2 Bath 1031 SF) at O2 METROTOWN?How many units are available at PH1 (3 Bed 2 Bath 1031 SF) at O2 METROTOWN?Has anything changed at PH1 (3 Bed 2 Bath 1031 SF) at O2 METROTOWN?Is PH1 (3 Bed 2 Bath 1031 SF) at O2 METROTOWN verified and when was it last confirmed?
