Governed Record Answer

What is the deposit structure for D (HOME 208) (Plan D) at O2 METROTOWN?

BURNABY, BCMOOV-5534Deposit
Answer

Deposit information is recorded for D (HOME 208) (Plan D) at O2 METROTOWN. Last confirmed on Nov 14, 2026. Verification state: Pending. Sign up free to see the details.

This answer comes directly from the governed housing record for O2 METROTOWN in BURNABY, BC. It reflects the record at its last confirmation and can change when the record is updated.