Governed Record Answer
When is E5 (Suite #711) (2.5 Bed 2 Bath 860 SF) at BASTILLE expected to complete?
Verified record COQUITLAM, BCMOOV-3655Completion
Answer
E5 (Suite #711) (2.5 Bed 2 Bath 860 SF) at BASTILLE has an expected completion of Jul 2025, last confirmed on Oct 3, 2026.
This answer comes directly from the governed housing record for BASTILLE in COQUITLAM, BC. It reflects the record at its last confirmation and can change when the record is updated.
About this record
Related questions
What is the deposit structure for E5 (Suite #711) (2.5 Bed 2 Bath 860 SF) at BASTILLE?What floor plans are available at E5 (Suite #711) (2.5 Bed 2 Bath 860 SF) at BASTILLE?How many units are available at E5 (Suite #711) (2.5 Bed 2 Bath 860 SF) at BASTILLE?Has anything changed at E5 (Suite #711) (2.5 Bed 2 Bath 860 SF) at BASTILLE?Is E5 (Suite #711) (2.5 Bed 2 Bath 860 SF) at BASTILLE verified and when was it last confirmed?
