SATORI A2
Heuristic vs Moovmynt aggregates not investment advice.
| Total units | Available | Sold | Status | Record |
|---|---|---|---|---|
| 78 | 0 | 0 | SELLING | Verified |
Inventory is shown at the project level. Available layouts are listed below when confirmed.
1 Layout
Each layout is verified separately, so layout details may have a different status than the overall project record.
Features are grouped to make the record easier to review.
Median and average price and size for 1 to 3 bedroom units (Moovmynt aggregate).
| Med. $ 1B | Avg. $ 1B | Med. SQ 1B | Avg. SQ 1B | Med. $ 2B | Avg. $ 2B | Med. SQ 2B | Avg. SQ 2B | Med. $ 3B | Avg. $ 3B | Med. SQ 3B | Avg. SQ 3B |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 574,900 | 615,523 | 819,900 | 963,777 | 1,089,900 | 1,299,011 |
Other layouts in this project that match the current beds and baths. Sign up to open any row.
| Identity | Value Metrics | Financials | Developer Info | Status | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Thumbnail | Project | FloorPlan | City | PropertyType | Beds | Baths | Price-$ | SQFT | Price/SQFT | Deposit | Commission | Bonus | Incentive | Discount | MortgageRate | Developer | Phase | CompletionDate | Stories | Units | Assignment | Status | Details |
![]() | SATORIThis record | A2 | COQUITLAM, BC | TOWNHOUSE | 1.0 | 1.0 | $550,000 | EVERGLADE DEVELOPMENT | Construction | Dec 2027 | 5 | 78 | Selling | ||||||||||
![]() | SATORI | A1 | COQUITLAM, BC | TOWNHOUSE | 1.0 | 1.0 | $550,000 | TBD | TBD | EVERGLADE DEVELOPMENT | Construction | Dec 2027 | 5 | 78 | Selling | ||||||||
Matching layouts from other projects within a 1 km radius of this record. Sign up to open any row.
| Identity | Value Metrics | Financials | Developer Info | Status | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Thumbnail | Project | FloorPlan | City | PropertyType | Beds | Baths | Price-$ | SQFT | Price/SQFT | Deposit | Commission | Bonus | Incentive | Discount | MortgageRate | Developer | Phase | CompletionDate | Stories | Units | Assignment | Status | Details |
![]() | KESTREL | A1 | COQUITLAM, BC | TOWNHOUSE | 1.0 | 1.0 | $479,900 | 478 | $1,004 | ADERA DEVELOPMENT | Pre-Construction | Oct 2027 | 4 | 118 | Selling | ||||||||
![]() | KESTREL | A2 | COQUITLAM, BC | TOWNHOUSE | 1.0 | 1.0 | $479,900 | 557 | $862 | ADERA DEVELOPMENT | Pre-Construction | Oct 2027 | 4 | 118 | Selling | ||||||||
![]() | KESTREL | A3 | COQUITLAM, BC | TOWNHOUSE | 1.0 | 1.0 | $479,900 | 557 | $862 | ADERA DEVELOPMENT | Pre-Construction | Oct 2027 | 4 | 118 | Selling | ||||||||
![]() | KESTREL | A8 | COQUITLAM, BC | TOWNHOUSE | 1.0 | 1.0 | $479,900 | 471 | $1,019 | ADERA DEVELOPMENT | Pre-Construction | Oct 2027 | 4 | 118 | Selling | ||||||||
![]() | AAVAND | Unit A | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $589,000 | 559 | $1,054 | CANADA WEST GROUP | Construction | Feb 2026 | 6 | 79 | Sold | ||||||||
![]() | AAVAND | N/A | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $589,000 | 559 | $1,054 | CANADA WEST GROUP | Construction | Feb 2026 | 6 | 79 | Sold | ||||||||
![]() | AAVAND | UNIT B | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $549,900 | 668 | $823 | CANADA WEST GROUP | Completed | Feb 2026 | 6 | 79 | Selling | ||||||||
![]() | AAVAND | UNIT B1 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $549,900 | 645 | $853 | CANADA WEST GROUP | Completed | Feb 2026 | 6 | 79 | Selling | ||||||||
![]() | AAVAND | UNIT C | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $549,900 | 668 | $823 | CANADA WEST GROUP | Completed | Feb 2026 | 6 | 79 | Selling | ||||||||
![]() | AAVAND | N/A | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $589,000 | 559 | $1,054 | CANADA WEST GROUP | Construction | Feb 2026 | 6 | 79 | Sold | ||||||||
![]() | AAVAND | 106 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $589,000 | 559 | $1,054 | CANADA WEST GROUP | Construction | Feb 2026 | 6 | 79 | Sold | ||||||||
![]() | AAVAND | 107 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $640,000 | 645 | $992 | CANADA WEST GROUP | Construction | Feb 2026 | 6 | 79 | Sold | ||||||||
![]() | ARCADIA | N/A | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $559,900 | 554 | $1,011 | QUANTUM PROPERTIES | Pre-Construction | Jun 2026 | 6 | 120 | Tbd | ||||||||
![]() | GARDENA - MAGNOLIA | B3 - EXTERIOR 108 SF | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $464,900 | 511 | $910 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Selling | ||||||||
![]() | GARDENA - MAGNOLIA | B2 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $464,900 | 485 | $959 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Selling | ||||||||
![]() | GARDENA - MAGNOLIA | B4 - EXTERIOR 71 SF | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $464,900 | 511 | $910 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Selling | ||||||||
![]() | GARDENA - MAGNOLIA | B3 - EXTERIOR 71 SF | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $464,900 | 511 | $910 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Selling | ||||||||
![]() | GARDENA - MAGNOLIA | B5 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $464,900 | 548 | $848 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Selling | ||||||||
![]() | GARDENA - MAGNOLIA | B1 - EXTERIOR 108 SF | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $464,900 | 469 | $991 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Selling | ||||||||
![]() | GARDENA - MAGNOLIA | B1 - EXTERIOR 70 SF | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $464,900 | 469 | $991 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Selling | ||||||||
![]() | GARDENA - MAGNOLIA | A - JR 1 BED - EXTERIOR 74 SF | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $429,900 | 400 | $1,075 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Sold | ||||||||
![]() | GARDENA - MAGNOLIA | A - JR 1 BED - EXTERIOR 69 SF | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $429,900 | 400 | $1,075 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Sold | ||||||||
![]() | GARDENA - MAGNOLIA | B4 - EXTERIOR 115 SF | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $464,900 | 511 | $910 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Selling | ||||||||
![]() | GARDENA - MAGNOLIA | B - EXTERIOR 108 SF | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $464,900 | 468 | $993 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Selling | ||||||||
![]() | GARDENA - MAGNOLIA | B - EXTERIOR 70 SF | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $464,900 | 468 | $993 | INTRACORP | Pre-Construction | Dec 2026 | 17 | 150 | Selling | ||||||||
![]() | GARDENA - LOTUS | A | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $479,900 | 398 | $1,206 | INTRACORP | Pre-Construction | Mar 2027 | 42 | 377 | Selling | ||||||||
![]() | GARDENA - LOTUS | B3 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $599,900 | 540 | $1,111 | INTRACORP | Pre-Construction | Mar 2027 | 42 | 377 | Selling | ||||||||
![]() | GARDENA - LOTUS | B2 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $599,900 | 540 | $1,111 | INTRACORP | Pre-Construction | Mar 2027 | 42 | 377 | Selling | ||||||||
![]() | ELMWOOD | B | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $656,355 | 393 | $1,670 | MARCON | Construction | Dec 2026 | 38 | 335 | Selling | ||||||||
![]() | ELMWOOD | C2 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $656,355 | 565 | $1,162 | MARCON | Construction | Dec 2026 | 38 | 335 | Selling | ||||||||
![]() | ELMWOOD | D | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $656,355 | 573 | $1,145 | MARCON | Construction | Dec 2026 | 38 | 335 | Selling | ||||||||
![]() | ELMWOOD | B1 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $656,355 | 396 | $1,657 | MARCON | Construction | Dec 2026 | 38 | 335 | Selling | ||||||||
![]() | ELMWOOD | C3 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $656,355 | 529 | $1,241 | MARCON | Construction | Dec 2026 | 38 | 335 | Selling | ||||||||
![]() | ELMWOOD | C1 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $656,355 | 510 | $1,287 | MARCON | Construction | Dec 2026 | 38 | 335 | Selling | ||||||||
![]() | IRONWOOD | T-A1 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $528,000 | 496 | $1,065 | QUALEX-LANDMARK | Construction | Dec 2028 | 44 | 428 | Selling | ||||||||
![]() | IRONWOOD | B-A4 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $528,000 | 517 | $1,021 | QUALEX-LANDMARK | Construction | Dec 2028 | 44 | 428 | Selling | ||||||||
![]() | IRONWOOD | B-A3 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $528,000 | 485 | $1,089 | QUALEX-LANDMARK | Construction | Dec 2028 | 44 | 428 | Sold | ||||||||
![]() | IRONWOOD | B-B7 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $528,000 | 522 | $1,011 | QUALEX-LANDMARK | Construction | Dec 2028 | 44 | 428 | Sold | ||||||||
![]() | IRONWOOD | T-A1a | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $568,000 | 496 | $1,145 | QUALEX-LANDMARK | Construction | Dec 2028 | 44 | 428 | Selling | ||||||||
![]() | IRONWOOD | B-A1 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $528,000 | 512 | $1,031 | QUALEX-LANDMARK | Construction | Dec 2028 | 44 | 428 | Selling | ||||||||
![]() | SOENHAUS | D1 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $615,900 | 540 | $1,141 | MARCON | Construction | TBD | 7 | 165 | Selling | ||||||||
![]() | SOENHAUS | C2 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $500,000 | 521 | $960 | MARCON | Construction | TBD | 7 | 165 | Selling | ||||||||
![]() | SOENHAUS | D5 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $671,200 | 612 | $1,097 | MARCON | Construction | TBD | 7 | 165 | Selling | ||||||||
![]() | SOENHAUS | C5 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $569,900 | 588 | $969 | MARCON | Construction | TBD | 7 | 165 | Selling | ||||||||
![]() | SOENHAUS | D4 | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $620,900 | 581 | $1,069 | MARCON | Construction | TBD | 7 | 165 | Selling | ||||||||
![]() | SOENHAUS | C | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $557,900 | 438 | $1,274 | MARCON | Construction | TBD | 7 | 165 | Selling | ||||||||
![]() | SOENHAUS | D | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $615,900 | 546 | $1,128 | MARCON | Construction | TBD | 7 | 165 | Selling | ||||||||
![]() | SMITH & FARROW | N/A | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $749,900 | 614 | $1,221 | Boffo Developments Ltd. | Construction | Nov 2024 | 46 | 348 | Tbd | ||||||||
![]() | SMITH & FARROW | N/A | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $749,900 | 614 | $1,221 | Boffo Developments Ltd. | Construction | May 2025 | 46 | 348 | Tbd | ||||||||
![]() | SMITH & FARROW | PLAN A | COQUITLAM, BC | CONDO | 1.0 | 1.0 | $749,900 | 614 | $1,221 | Boffo Developments Ltd. | Construction | May 2025 | 46 | 348 | Selling | ||||||||
Governed price, PPSF, supply, and verified coverage figures for enabled layout records at increasing distance and administrative scope from this record.
| Ring | Records | Median $ | Avg $ | Median PPSF | Avg PPSF | Starting $ | Active Supply | Projects | Verified |
|---|---|---|---|---|---|---|---|---|---|
| Within 1 km | 312 | 814,900 | 932,675 | 993 | 1,007 | 428,000 | 2,721 | 31 | 42% |
| Within 3 km | 627 | 817,500 | 911,011 | 966 | 995 | 389,900 | 4,306 | 61 | 34% |
| Within 5 km | 732 | 810,000 | 906,590 | 956 | 987 | 389,900 | 4,977 | 73 | 31% |
| Within 10 km | 2397 | 779,900 | 871,815 | 984 | 1,011 | 300,000 | 16,587 | 327 | 32% |
| COQUITLAM, BC | 797 | 899,000 | 975,730 | 923 | 951 | 379,900 | 5,144 | 72 | 21% |
| BC Lower Mainland | 6492 | 922,900 | 1,115,623 | 1,008 | 1,088 | 299,900 | 34,090 | 1091 | 24% |
| Subject PPSF | Project Median PPSF | 1 km Median PPSF | City Median PPSF |
|---|---|---|---|
| 1,024 | 851 | 993 | 923 |
Same beds, similar size cohort (69 records): median price 589,000
This record's implied price at each reference market's median PPSF, and the spread to its actual recorded price.
| Reference Market | Median PPSF | Implied Price | Spread to Subject |
|---|---|---|---|
| Within 1 km | 993 | 533,241 | -16,759 |
| Within 3 km | 966 | 518,742 | -31,258 |
| Within 5 km | 956 | 513,372 | -36,628 |
| Within 10 km | 984 | 528,408 | -21,592 |
| City | 923 | 495,651 | -54,349 |
Every answer comes directly from this governed record and shows its confirmation date.
A2 at SATORI is listed at $550,000, last confirmed on Sep 25, 2026.
Deposit information is recorded for A2 at SATORI. Last confirmed on Sep 25, 2026. Verification state: Verified. Sign up free to see the details.
A2 at SATORI has an expected completion of Dec 2027, last confirmed on Sep 25, 2026.
A2 at SATORI has 1 floor plan on file: A2, last confirmed on Sep 25, 2026.
A2 at SATORI currently has no units marked available out of 78 total units, last confirmed on Sep 25, 2026.
A2 at SATORI is a governed Moovmynt housing record. Last confirmed on Sep 25, 2026. Verification state: Verified.
A2 at SATORI is developed by EVERGLADE DEVELOPMENT, last confirmed on Sep 25, 2026.
A2 at SATORI is located at 612 Thompson Avenue in COQUITLAM, BC, last confirmed on Sep 25, 2026.












