PIER WEST (WEST TOWER) PLAN C (Unit 3106)
Heuristic vs Moovmynt aggregates not investment advice.
| Total units | Available | Sold | Status | Record |
|---|---|---|---|---|
| 364 | 364 | 0 | SELLING | Verified |
Inventory is shown at the project level. Available layouts are listed below when confirmed.
1 Layout
Each layout is verified separately, so layout details may have a different status than the overall project record.
Features are grouped to make the record easier to review.
Median and average price and size for 1 to 3 bedroom units (Moovmynt aggregate).
| Med. $ 1B | Avg. $ 1B | Med. SQ 1B | Avg. SQ 1B | Med. $ 2B | Avg. $ 2B | Med. SQ 2B | Avg. SQ 2B | Med. $ 3B | Avg. $ 3B | Med. SQ 3B | Avg. SQ 3B |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 574,900 | 615,523 | 819,900 | 963,777 | 1,089,900 | 1,299,011 |
Other layouts in this project that match the current beds and baths. Sign up to open any row.
| Identity | Value Metrics | Financials | Developer Info | Status | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Thumbnail | Project | FloorPlan | City | PropertyType | Beds | Baths | Price-$ | SQFT | Price/SQFT | Deposit | Commission | Bonus | Incentive | Discount | MortgageRate | Developer | Phase | CompletionDate | Stories | Units | Assignment | Status | Details |
![]() | PIER WEST (WEST TOWER)This record | PLAN C (Unit 3106) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||||
![]() | PIER WEST (WEST TOWER) | Plan C (Unit 4106 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C (Unit 3406 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $765,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C (Unit 4006 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C1 (Unit 3901 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Sold | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan Sky D (36th Level) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $1,374,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C (Unit 4206 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan Sky C1 (48th Level) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $1,151,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C4 (28th Level) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $773,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | PLAN C (Unit 3306) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $793,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Tbd | ||||||||
![]() | PIER WEST (WEST TOWER) | D (UNIT 4207) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $1,032,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C (Unit 3506 – East Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $797,900 | TBD | TBD | BOSA PROPERTIES | Construction | TBD | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C (Unit 3306 – East Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $793,900 | TBD | TBD | BOSA PROPERTIES | Construction | TBD | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C2 (28th Level) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $773,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan Sky C (48th Level) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $1,151,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C1 (Unit 3001 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C4 (Unit 3604 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $835,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Sold | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C1 (28th Level) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C4 (Unit 3404 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $829,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Sold | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C (Unit 2806 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $773,000 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C1 (Unit 3501 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan D (9th Level) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $1,028,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C2 (Unit 2503 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $799,000 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C (Unit 3106 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $776,000 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | PLAN SD1 | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $1,374,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan D1 (9th Floor) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $1,028,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C4 (Unit 4104 – West Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $844,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Sold | ||||||||
![]() | PIER WEST (WEST TOWER) | Plan C (28th Level) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $781,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | PLAN C (Unit 3406) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | TBD | TBD | BOSA PROPERTIES | Completed | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | PLAN SD | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $795,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Selling | ||||||||
![]() | PIER WEST (WEST TOWER) | PLAN C (Unit 2606) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $779,900 | TBD | TBD | BOSA PROPERTIES | Construction | Jun 2024 | 53 | 364 | Sold | ||||||||
Matching layouts from other projects within a 1 km radius of this record. Sign up to open any row.
| Identity | Value Metrics | Financials | Developer Info | Status | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Thumbnail | Project | FloorPlan | City | PropertyType | Beds | Baths | Price-$ | SQFT | Price/SQFT | Deposit | Commission | Bonus | Incentive | Discount | MortgageRate | Developer | Phase | CompletionDate | Stories | Units | Assignment | Status | Details |
![]() | PIER WEST (EAST TOWER) | PLAN C1 (Unit 1301) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 933 | $812 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | Plan C (Unit 3506 – East Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 2406) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 2706) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 1501) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 933 | $812 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 3306) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 2306) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN SC1 | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $1,069,900 | 1,242 | $861 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | Plan C1 (Unit 1601 – East Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 933 | $812 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Sold | ||||||||
![]() | PIER WEST (EAST TOWER) | Plan C1 (Unit 2301 – East Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 933 | $812 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Sold | ||||||||
![]() | PIER WEST (EAST TOWER) | Plan C1 (Unit 2401 – East Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 933 | $812 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN D (UNIT 2607) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $999,900 | 1,199 | $834 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 3106) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN SC | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $1,069,900 | 948 | $1,129 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | Plan C (Unit 3306 – East Tower) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN D (UNIT 1707) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $999,900 | 1,199 | $834 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN D1 (UNIT 1808) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $999,900 | 1,232 | $812 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 3506) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 2806) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 3006) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 2206) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 1601) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 933 | $812 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Sold | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN D (UNIT 2107) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $999,900 | 1,199 | $834 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 1401) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 933 | $812 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN E | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $1,117,900 | 1,185 | $943 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 2906) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN SC2 | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $1,069,900 | 1,350 | $793 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 2406) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C1 | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 933 | $812 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C4 | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 933 | $812 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 3206) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 3406) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | PIER WEST (EAST TOWER) | PLAN C (Unit 2506) | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $757,900 | 860 | $881 | BOSA DEVELOPMENT | Construction | Mar 2025 | 43 | 301 | Selling | ||||||||
![]() | 618 CARNARVON | C6 | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $761,900 | 838 | $909 | SKYLLEN PACIFIC | Completed | Sep 2023 | 33 | 262 | Selling | ||||||||
![]() | OVATION | PLAN N | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $850,800 | 876 | $971 | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | THK | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | TBD | 1,075 | TBD | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | 507 813 CARNARVON STREET | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | TBD | 1,077 | TBD | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | N/A | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | TBD | 1,131 | TBD | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | THH | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | TBD | 1,131 | TBD | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | N/A | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | TBD | 1,077 | TBD | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | CH-G Plan | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $996,800 | 1,227 | $812 | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | PLAN A | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $787,800 | 842 | $936 | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | N/A | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | TBD | 1,028 | TBD | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | CH-C Plan | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $892,800 | 1,077 | $829 | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | N/A | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | TBD | 1,075 | TBD | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | CH-K Plan | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | $892,800 | 1,075 | $831 | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | N/A | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | TBD | 1,227 | TBD | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | CH-B Plan | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | TBD | 1,124 | TBD | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
![]() | OVATION | THJ | NEW WESTMINSTER, BC | CONDO | 2.0 | 2.0 | TBD | 1,028 | TBD | DOMUS HOMES | Completed | Jan 2024 | 32 | 204 | Sold | ||||||||
Governed price, PPSF, supply, and verified coverage figures for enabled layout records at increasing distance and administrative scope from this record.
| Ring | Records | Median $ | Avg $ | Median PPSF | Avg PPSF | Starting $ | Active Supply | Projects | Verified |
|---|---|---|---|---|---|---|---|---|---|
| Within 1 km | 96 | 757,900 | 828,058 | 881 | 896 | 456,900 | 466 | 3 | 44% |
| Within 3 km | 169 | 892,800 | 898,172 | 833 | 800 | 419,900 | 754 | 17 | 49% |
| Within 5 km | 598 | 757,900 | 800,467 | 929 | 917 | 349,900 | 4,831 | 116 | 32% |
| Within 10 km | 2514 | 766,000 | 843,652 | 969 | 994 | 300,000 | 18,185 | 376 | 32% |
| NEW WESTMINSTER, BC | 143 | 830,800 | 865,200 | 866 | 820 | 419,900 | 565 | 7 | 53% |
| BC Lower Mainland | 6461 | 927,150 | 1,118,708 | 1,011 | 1,089 | 299,900 | 33,726 | 1091 | 24% |
| Subject PPSF | Project Median PPSF | 1 km Median PPSF | City Median PPSF |
|---|---|---|---|
| 881 | 906 | 881 | 866 |
Same beds, similar size cohort (37 records): median price 757,900
This record's implied price at each reference market's median PPSF, and the spread to its actual recorded price.
| Reference Market | Median PPSF | Implied Price | Spread to Subject |
|---|---|---|---|
| Within 1 km | 881 | 757,660 | -240 |
| Within 3 km | 833 | 716,380 | -41,520 |
| Within 5 km | 929 | 798,940 | 41,040 |
| Within 10 km | 969 | 833,340 | 75,440 |
| City | 866 | 744,760 | -13,140 |
Every answer comes directly from this governed record and shows its confirmation date.
PLAN C (Unit 3106) at PIER WEST (WEST TOWER) is listed at $757,900, last confirmed on Jun 16, 2026.
Deposit information is recorded for PLAN C (Unit 3106) at PIER WEST (WEST TOWER). Last confirmed on Jun 16, 2026. Verification state: Verified. Sign up free to see the details.
PLAN C (Unit 3106) at PIER WEST (WEST TOWER) has an expected completion of Jun 2024, last confirmed on Jun 16, 2026.
PLAN C (Unit 3106) at PIER WEST (WEST TOWER) has 1 floor plan on file: PLAN C (Unit 3106), last confirmed on Jun 16, 2026.
PLAN C (Unit 3106) at PIER WEST (WEST TOWER) has 364 of 364 units marked available, last confirmed on Jun 16, 2026.
The price record for PLAN C (Unit 3106) at PIER WEST (WEST TOWER) has changed 2 times. The most recent change was recorded on Sep 17, 2026. Last confirmed on Jun 16, 2026. Verification state: Verified. Sign up free to see the details.
PLAN C (Unit 3106) at PIER WEST (WEST TOWER) is a governed Moovmynt housing record. Last confirmed on Jun 16, 2026. Verification state: Verified.
PLAN C (Unit 3106) at PIER WEST (WEST TOWER) is developed by BOSA PROPERTIES, last confirmed on Jun 16, 2026.
PLAN C (Unit 3106) at PIER WEST (WEST TOWER) is located at 680 QUAYSIDE DRIVE in NEW WESTMINSTER, BC, last confirmed on Jun 16, 2026.


















