Governed Record Answer

What is the deposit structure for PLAN CC14 - 224 at RC AT CF RICHMOND CENTRE?

Verified record RICHMOND, BCMOOV-9511Deposit
Answer

Deposit information is recorded for PLAN CC14 - 224 at RC AT CF RICHMOND CENTRE. Last confirmed on Jun 13, 2026. Verification state: Verified. Sign up free to see the details.

This answer comes directly from the governed housing record for RC AT CF RICHMOND CENTRE in RICHMOND, BC. It reflects the record at its last confirmation and can change when the record is updated.