What changed at WINONA

Every entry below comes from the governed record for WINONA in VANCOUVER, BC. Each change shows the value before, the value after, and the date it was confirmed.

Mar 20, 2026

Expected completion was recorded as Jan 2022.

This shows recorded price and completion changes. Sign in to see deposit, incentive and assignment history as well.

About this record
RAICHU DEVELOPMENT GROUPCONDO
RAICHU DEVELOPMENT GROUP
7638 Cambie Street, Vancouver, BC, VANCOUVER, BC
Total Deposit00.0%
TBD000 PPSF 2022-01-01
2.5 Beds 2.0 Baths 000 Sq Ft

View the full housing record for WINONA

Browse every question this record can answer